top of page

Increased Profit Margin

Enabled approximately $3 million in production savings due to minimized downtime.

Reduced Project Costs

Hydrocutting services were provided at about 25% of the cost of traditional flame-based methods

Enhanced Safety and Efficiency

The flame-free process reduced risks and ensured a safe working environment while significantly decreasing project time.

Estimated Value Savings

Project Description

Type of Cutting

CASE STUDY REPORT

Project 
Name

Client Name

22 September 2023

The Cut

By utilizing hydrocutting, the extraction was completed in just 2 days, which was 71% faster than traditional methods. This rapid completion reduced downtime and allowed the company to return to normal operations much sooner than anticipated, providing substantial cost and time savings.

Increased Profit Margin

Enabled approximately $3 million in production savings due to minimized downtime.

Reduced Project Costs

Client estimates they saved anywhere from $650,000 to $1.5 million working with NuWave on this project

Enhanced Safety and Efficiency

The flame-free process reduced risks and ensured a safe working environment while significantly decreasing project time.

Estimated Value Savings