Increased Profit Margin
Enabled approximately $3 million in production savings due to minimized downtime.
Reduced Project Costs
Hydrocutting services were provided at about 25% of the cost of traditional flame-based methods
Enhanced Safety and Efficiency
The flame-free process reduced risks and ensured a safe working environment while significantly decreasing project time.
Estimated Value Savings
Project Description
Type of Cutting
CASE STUDY REPORT
Project
Name
Client Name
22 September 2023
The Cut
By utilizing hydrocutting, the extraction was completed in just 2 days, which was 71% faster than traditional methods. This rapid completion reduced downtime and allowed the company to return to normal operations much sooner than anticipated, providing substantial cost and time savings.
Increased Profit Margin
Enabled approximately $3 million in production savings due to minimized downtime.
Reduced Project Costs
Client estimates they saved anywhere from $650,000 to $1.5 million working with NuWave on this project
Enhanced Safety and Efficiency
The flame-free process reduced risks and ensured a safe working environment while significantly decreasing project time.