NuWave Industries
We adapted our well-bore abandonment process to pipeline risers so as to fill a market need that existed. Our patented Pipeline Road Crossing Abandonments always achieve an excellent bond without bleed water, particle settling, air entrapment, void spaces or channelling when cutting/cementing abandoned pipelines under roadways, canals and railways Suitable for use in pipe as small as 2" Complete 7+ abandonments per day.
Abandoning Pipeline Risers
NuWave Industries has developed a process that adheres and respects all regulations required for decommissions. Our team has optimized the process of abandoning risers by creating cutting tools that:
Require less equipment to prepare a site for cutting the risers (reduced footprints)
Cut faster and cleaner, making an easier removal process
Eliminate a need for hot work permits and or any combustion mitigation (elimination of ignition points)
Pipeline Road Crossing Abandonments for Seamless Pipeline Closure
Feel Free to Contact Us
Contact Us
Your content has been submitted
Waterjet Cutting Case Studies
Proven Results
Client Name
Project Name is Lorem Ipsum which is a dummy text
Read More
Client Name
Project Name is Lorem Ipsum which is a dummy text
Read More
Client Name
Project Name is Lorem Ipsum which is a dummy text
Read More